Allison Bay Subdivision Earthworks
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The proposed subdivision development will consist of constructing approximately 46 residential lots, including underground utility installation, site roadways with associated ditching, and comprehensive lot grading. The site is located approximately 500 meters west of the existing Allison Bay subdivision, and construction of the proposed subdivision roadways will also provide a secondary access point to the Allison Bay subdivision. The majority of the site has been previously cleared as a fire break in 2023, an additional 6 ha will be cleared for construction of roads, connecting existing tie-ins for water, sewer and power and lot grading. Housing construction will be completed separately in the future.
Latest update
Participate
Contacts
Environmental Review Process Alberta RegionLands, Environment and Economic Development
630 Canada Place, 9700 Jasper Avenue
Edmonton, Alberta T5J 4G2
Email: paeab-erpab@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- ALLISON BAY NO. 219 (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2026-03-24 -
Proponent
Mikisew Cree First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90313
Nearby assessments
...within 200 kilometres-
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Big Egg Lake Water Control Structure
Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201) -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Wood Buffalo National Park Moose Island Fire Guard Maintenance
Wood Buffalo National Park of Canada -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Culvert Replacement and Repair at km 41 Hay Camp Road
Wood Buffalo National Park of Canada -
Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Berry Plant Clearing in Pine Lake Campground, Wood Buffalo National Park
Wood Buffalo National Park -
Frontier Oil Sands Mine Project
Fort McKay -
New Fibre Installation
Project site 1: Thabacha Náre 196A & Thebathi 196 -
Pierre River Mine Project
Fort McKay -
Former Gunnar Mine Site Rehabilitation Project
Gunnar -
Smith's Landing First Nation Phase 1(a) Housing Development
Smiths Landing First Nation -
Big Bear Camp Aerodrome Project
Grygar Lake -
Smith's Landing First Nation Phase 1A Housing Development (Part 2)
Smiths Landing First Nation -
L150 Anchor Inspection and Repair
Wood Buffalo National Park of Canada -
NTPC L-150 Anchor Inspection and Rehabilitation Project, Highway 5
Wood Buffalo National Park of Canada -
Jackpine Mine Expansion Project
Fort McKay -
Patterson Lake South Mine Project
Patterson Lake -
Rook I Project
Patterson Lake -
Little Red River Housing Project MLG# 28404408 (3 Units)
Little Red River Cree Nation -
Wood Buffalo National Park Highway 5 rehabilitation
Wood Buffalo National Park of Canada -
Wood Buffalo National Park Highway Asphalt Surface Treatment
Wood Buffalo National Park -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Carbon Capture Infrastructure and Lateral Pipelines -
Pelican Lake First Nation Gas Bar Upgrade
Chitek Lake IR 191 -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray