Armand Bekkattla Treatment Centre Recapitalization and Expansion
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Clearwater River Dene Nation is proposing the expansion and renovation of the Armand Bekkattla Treatment Centre. Expansion will include extension of the wings of the existing building and addition of a new administrative section, renovation throughout the existing building, addition of sweat lodge and exercise buildings behind the building (to the east), and addition of greenspace and future garden area. Underground water and sewer may be required for the sweat lodge. Existing buildings on the site such as storage building and sea cans will be relocated elsewhere on the site. The site will be fully enclosed by fence. Utility power may be upgraded and extended to new buildings through the provincial supplier. Temporary construction facilities and equipment/laydown areas near the site may be required. This may include washroom facilities and power.
Site preparation activities include tree clearing and temporary relocation of existing structures to facilitate new construction. Activities during construction include select demolition of building components, including deck, exterior finishes, landscape features (concrete blocks), minor excavation and earthworks, building construction including structural, architectural, mechanical and electrical scopes. During demolition, materials that can be salvaged will be set aside for reuse and recycling. Remaining materials will be taken to an approved landfill site for disposal.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | February 18, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | January 3, 2025 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Clearwater River Dene Band 222 (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2025-01-03 -
Proponent
Clearwater River Dene Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89155
Nearby assessments
...within 200 kilometres-
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
La Loche Hotel
La Loche -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 2) -
Birch Narrows First Nation Solid Waste Transfer Station
Turnor Lake Indian Reserve 193B -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 1) -
Birch Narrows Dene Nation Community Centre
Birch Narrows Dene Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 3) -
Buffalo River Dene Nation School Bypass Road Relocation
Buffalo River Dene Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
Buffalo River Dene Nation Fire Hall
Peter Pond Lake Indian Reserve No. 193 -
Buffalo River Dene Nation Lagoon Expansion
BUFFALO RIVER DENE NATION RESERVE NO. 193 -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
0861 - Upgrade (33 & 48 - 60mm) North Janvier
Janvier -
1121393 - 0861 - SubD(13RUP) CPFN Janvier - Phase 2
Janvier -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176 -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176A -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Main Transportation Pipeline -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
Patterson Lake South Mine Project
Patterson Lake -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Rook I Project
Patterson Lake -
Blanket Permit - SaskPower - Wapachewunak First Nation (English River First Nation)
Wapachewunak First Nation No. 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 2) -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 1) -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Carbon Capture Infrastructure and Lateral Pipelines -
Big Bear Camp Aerodrome Project
Grygar Lake -
Jackpine Mine Expansion Project
Fort McKay -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta
Cenovus Foster Creek - North Trunk Gate (NTG) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
Pierre River Mine Project
Fort McKay -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Frontier Oil Sands Mine Project
Fort McKay -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
La Plonge Solar Project
English River First Nation Reserve -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake