Blanket Permit - SaskPower - Wapachewunak First Nation (English River First Nation)
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Electrical Distribution Infrastructure - Permit for the whole of Wapachewunak First Nation No. 92D for as long as needed. SaskPower may install and maintain electrical distribution lines and all structures, poles, cables, anchors, pipes, conduits, apparatus and equipment in relation thereto on the above noted reserve. Activities under the blanket permit may include but are not limited to: surveying, affixing, constructing, placing, replacing and repairing, maintaining, operating and removing electrical distribution lines and all structures, poles, wires, cables, anchors, pipes, conduits, apparatus and equipment in relation thereto, and all works necessary or appurtenances ancillary and useful in connection with or incidental to the construction, operation or maintenance of electrical distribution lines.
SaskPower may use roads and trails for access to and from electrical distribution lines to complete the above-mentioned activities. All garbage and debris generated will be removed and disposed of in an approved receptacle or facility.
Distribution facilities may be placed in close proximity to wetlands and drainages, but efforts are made to avoid these features where feasible. Any work near fish-bearing waterways or wetlands will undergo a Department of Oceans and Fisheries (DFO) self-assessment and further review.
Latest update
.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the SaskPower Blanket Permit for Wapachewunak First Nation (English River First Nation) | - | November 4, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | October 6, 2025 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Wapachewunak First Nation No. 192D (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2025-10-06 -
Proponent
Wapachewunak First Nation (English River First Nation). -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89927
Nearby assessments
...within 200 kilometres-
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 1) -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Buffalo River Dene Nation Lagoon Expansion
BUFFALO RIVER DENE NATION RESERVE NO. 193 -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Fire Hall
Peter Pond Lake Indian Reserve No. 193 -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Buffalo River Dene Nation School Bypass Road Relocation
Buffalo River Dene Nation -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
La Plonge Solar Project
English River First Nation Reserve -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 3) -
Birch Narrows Dene Nation Community Centre
Birch Narrows Dene Nation -
Birch Narrows First Nation Solid Waste Transfer Station
Turnor Lake Indian Reserve 193B -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
La Loche Hotel
La Loche -
Armand Bekkattla Treatment Centre Recapitalization and Expansion
Clearwater River Dene Band 222 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Dore Lake Wharf Removal
Dore Lake -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 7: West Central region - Thunderchild Fixed Wireless Tower -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
La Ronge RCMP New Detachment
La Ronge -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
1121393 - 0861 - SubD(13RUP) CPFN Janvier - Phase 2
Janvier -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
0861 - Upgrade (33 & 48 - 60mm) North Janvier
Janvier -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 5: West Central region - Grandmother's Bay -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Key Lake Extension Project
Key Lake -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Main Transportation Pipeline -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1)