Tazi Twé Hydroelectric Project
Saskatchewan Power Corporation is proposing the construction, operation, decommissioning and abandonment of a 50 megawatt water diversion type electrical generating station at Elizabeth Falls. The proposed project would be located adjacent to the Fond du Lac River between Black Lake and Middle Lake, on Black Lake Denesuline First Nation reserve land Chicken 224 in northern Saskatchewan. The proposed project would involve the construction and operation of a water intake, a power tunnel, a powerhouse, a tail race, a submerged weir, a construction camp, a bridge, and access roads.
Note this project was formerly known as the Elizabeth Falls Hydroelectric Project.
Latest update
Participate
Contacts
Compliance Promotion & Follow-up TeamImpact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Email: postdecision@iaac-aeic.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Chicken Indian Reserve No. 224 (Saskatchewan)
-
Nature of Activity
- Hydroelectric Energy
-
Assessment Status
Completed -
Start Date
2013-03-01 -
Proponent
Saskatchewan Power Corporation -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Environmental assessment under CEAA 2012 -
Reference Number
80031
Nearby assessments
...within 200 kilometres-
Black Lake First Nation Lagoon Upgrades
Black Lake First Nation -
Black Lake First Nation Firehall
Black Lake First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 7: North East region - Black Lake -
Highway 905 - All Weather Roadway - Stony Rapids to Lake Athabasca near Fond-du-Lac
Stony Rapids -
Black Lake First Nation - Road Resurfacing and Improvements
Black Lake First Nation -
Sand and Gravel Permit - Fond du Lac Airport Resurfacing project
Fond du Lac IR #227 -
Upgrade Single Tower & New Fibre Installation
Project site 8: North East region - Fond-du-Lac -
Fond Du Lac Environmental Remediation
Fond du Lac IR 227 -
Fond du Lac First Nation Water Treatment Plant Expansion
Fond du Lac IR 227 -
Highway 905 - All Weather Roadway - Stony Rapids to Lake Athabasca near Fond-du-Lac
-
Pelican Lake First Nation Gas Bar Upgrade
Chitek Lake IR 191 -
Highway 914 - All Weather Roadway - McArthur River Mine Site to Cigar Lake Mine Site
-
Mining and Milling the Midwest Project
McClean Lake Operation -
Highway 914 - All Weather Roadway - McArthur River Mine Site to Cigar Lake Mine Site
Waterbury Lake -
Upgrade Single Tower & New Fibre Installation
Project site 9: North East region - Wollaston Lake -
Hatchet Lake Denesuline First Nation Nursing Station
Hatchet Lake Denesuline First Nation -
Hatchet Lake Landfill
LAC LA HACHE INDIAN RESERVE NO. 220 -
Hatchet Lake Lagoon Upgrades
LAC LA HACHE INDIAN RESERVE NO. 220 -
Millennium Mine Project
Moon Lake -
Wheeler River Project
Russell Lake -
Former Gunnar Mine Site Rehabilitation Project
Gunnar