Black Lake First Nation Lagoon Upgrades
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Black Lake First Nation is proposing the construction of a lagoon upgrades project. The project includes the construction of a new primary and storage cell to expand the capacity of the existing lagoon. The lagoon site is located approximately 2 km north of the Black Lake First Nation community, and expansion of the new cells will be immediately to the east of the existing cells.
Construction will consist of expanding to the existing facultative lagoon, which will include construction of a 5.45 ha primary cell and storage cell with 237,800 cu.m. capacity, complete with installation of all interconnecting and release structures. The lagoon upgrade project will continue to use the existing effluent discharge route, which releases to the west of the lagoon and flows approximately 9 km through a creek containing several low-lying, naturally occurring detention-type pond areas before ultimately entering Middle Lake.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | December 12, 2025 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Black Lake First Nation (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2025-12-12 -
Proponent
Black Lake Fist Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90086
Nearby assessments
...within 200 kilometres-
Black Lake First Nation Firehall
Black Lake First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 7: North East region - Black Lake -
Tazi Twé Hydroelectric Project
Chicken Indian Reserve No. 224 -
Highway 905 - All Weather Roadway - Stony Rapids to Lake Athabasca near Fond-du-Lac
Stony Rapids -
Black Lake First Nation - Road Resurfacing and Improvements
Black Lake First Nation -
Sand and Gravel Permit - Fond du Lac Airport Resurfacing project
Fond du Lac IR #227 -
Upgrade Single Tower & New Fibre Installation
Project site 8: North East region - Fond-du-Lac -
Fond Du Lac Environmental Remediation
Fond du Lac IR 227 -
Fond du Lac First Nation Water Treatment Plant Expansion
Fond du Lac IR 227 -
Highway 905 - All Weather Roadway - Stony Rapids to Lake Athabasca near Fond-du-Lac
-
Pelican Lake First Nation Gas Bar Upgrade
Chitek Lake IR 191 -
Highway 914 - All Weather Roadway - McArthur River Mine Site to Cigar Lake Mine Site
-
Mining and Milling the Midwest Project
McClean Lake Operation -
Highway 914 - All Weather Roadway - McArthur River Mine Site to Cigar Lake Mine Site
Waterbury Lake -
Millennium Mine Project
Moon Lake -
Upgrade Single Tower & New Fibre Installation
Project site 9: North East region - Wollaston Lake -
Hatchet Lake Denesuline First Nation Nursing Station
Hatchet Lake Denesuline First Nation -
Wheeler River Project
Russell Lake -
Hatchet Lake Landfill
LAC LA HACHE INDIAN RESERVE NO. 220 -
Hatchet Lake Lagoon Upgrades
LAC LA HACHE INDIAN RESERVE NO. 220 -
Former Gunnar Mine Site Rehabilitation Project
Gunnar