Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 is proposing to upgrade the Sewage Pumping Stations (SPS's) in the community of Deschambault Lake. The existing pumps have reached their expected life cycle and have no back up power. The existing infrastructure includes eight sewage pumping stations. At all eight sites, all infrastructure except for the existing wet wells will be decommissioned and removed from site and at each site a larger SPS structure will be built over the retained wet well.
Clearing and grubbing of the site at all SPS locations will take place outside of the migratory bird nesting season. Topsoil will be retained, unmixed, near the site from which it was removed. The existing fence will be removed and the entire existing structure will be selectively demolished and salvaged except for the wet well at each SPS location. A new, expanded SPS superstructure composed of electrical room, generator room and pump room as required at each site will be constructed. Back up power systems is also included in the upgraded design. The SPS sites will be regraded so that stormwater drains freely away from the proposed buildings and to limit flooding from runoff flows caused by rainfall events or snow melt. All imported soil materials will be clean and free of hazardous materials. A new maintenance-free, industrial grade security fence (min overall height of 1.83m) will be installed around each site and will include a vehicle access swing gate and a pedestrian door entrance, both with locks. The operations of the new facilities will be similar to current operations.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Deschambault Lake Sewage Pumping Station Upgrade | - | March 4, 2024 |
| 1 | Notice of Intent -Start of Public Comment Period | - | February 5, 2024 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 (Saskatchewan)
- Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2024-02-05 -
Proponent
Peter Ballantyne Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
87300
Nearby assessments
...within 200 kilometres-
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Deschambault Lake Road Resurfacing and Drainage Improvements
Kimosom Pwatinahk I.R. No. 203 -
Deschambault Lake Lagoon Expansion
The Peter Ballantyne Cree Nation (PBCN) Kimosom Pwatinahk I.R No. 203 -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Pelican Narrows Subdivision Stage 7
Pelican Narrows I.R. No. 184B -
Upgrade Single Tower & New Fibre Installation
Project site 5: Central East region - Pelican Narrows -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Pelican Narrows Lagoon Expansion
Pelican Narrows I.R. No. 184B -
Upgrade Single Tower & New Fibre Installation
Project site 3: Central East region - Denare Beach -
Lac La Ronge Indian Band Stanley Mission - Loon Lake Subdivision Stage 3
Stanley Mission 157 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 6: West Central region - Stanley Mission -
Sandy Bay Lagoon Upgrade
Peter Ballantyne Cree Nation WAPASKOKIMAW INDIAN RESERVE NO. 202 -
Upgrade Single Tower & New Fibre Installation
Project site 6: Central East region - Sandy Bay -
Sandy Bay Road Upgrades
Wapaskokimaw Indian Reserve No. 202 -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
McIlvenna Bay Mine Project
Creighton -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon -
La Ronge Area Peat Harvesting Project
La Ronge -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 5: West Central region - Grandmother's Bay -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Sturgeon Weir Water and Wastewater Upgrades
Sturgeon Weir I.R. 205 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
La Ronge RCMP New Detachment
La Ronge -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Upgrade Single Tower & New Fibre Installation
Project site 7: Central East region - Sturgeon Landing -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Peter Ballantyne Cree Nation Southend Wastewater and Raw Water Upgrades
Southend Indian Reserve No. 200 -
Peter Ballantyne Cree Nation Southend Solid Waste Transfer Station
SE 1/4 36-10-84 W2M -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 4: West Central region - Southend & Reindeer -
Southend RCMP Detachment Major Renovation
Southend -
Peter Ballantyne Cree Nation Southend Lot Drainage and Improvement
Southend -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Mathias Colomb -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Red Earth River Dike Extension
Red Earth IR 29A -
Mathias Colomb Cree Nation Nursing Station Replacement
Mathias Colomb Cree Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Opaskwayak Cree Nation (OCN) Bracken Dam Earthen Dike Extension
Opaskwayak Cree Nation -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Montreal Lake RCMP New Detachment
Montreal Lake -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour