Pelican Narrows Subdivision Stage 7
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Peter Ballantyne Cree Nation is proposing to construct a new subdivision to support future population growth and housing on-reserve. The Stage 7 subdivision is planned to occupy a 9.68 ha area within the core community of Pelican Narrows I.R. No. 184B, with proposed water and wastewater connections located at the Reserve/Northern Village boundary.
The project includes upgrades to the existing sewage/wastewater pumping station (SPS) No. 6 and water and wastewater distribution services to help serve the projected future on-reserve population of 7,038 and Northern Village of Pelican Narrows population of 200 by 2044. Currently, 29 existing homes within the subdivision have tank systems for water and wastewater services. The project will connect these homes plus another 34 new lots to the water and wastewater pipeline distribution system. Fire hydrants will be included for fire protection. Existing roadways will be upgraded, and cul-de-sacs and new roadways with drainage ditches will be constructed.
Blasting will likely be required throughout the subdivision to install the water and wastewater pipelines considering the prevalence of shallow bedrock. These pipelines may require insulation where a depth of cover is insufficient to protect the pipes from frost penetration. The existing Reserve recirculating water distribution loop proposed along Custer Road will have a new 200 mm outside diameter (OD) HDPE DR13.5 watermain connections added. The existing water distribution loop that services SPS No. 6 and the arena will be decommissioned in favour of a new connection to the proposed water main servicing the Stage 7 Subdivision. Two sanitary wastewater catchment areas are proposed within the subdivision to reduce the amount of bedrock blasting and to maintain a gravity drain to SPS No.7.
SPS No. 6, constructed in 1996, will be upgraded to meet current codes and regulations and to service the northern portion of the new subdivision. Upgrades to the building include masonry walls with brick fascia exterior, conversion of the existing service room to a pump room with existing wet-well, piping, valves and instrumentation. The building expansion will include reinforced concrete slab, a generator room, an electrical room and new roof. A propane tank outside the building will be within a fenced compound with a new gravel driveway, potable water service and the lot will be graded for positive drainage.
Site preparation activities will include vegetation clearing, topsoil stripping and stockpiling, and bedrock blasting.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | December 3, 2024 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | October 29, 2024 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Pelican Narrows I.R. No. 184B (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2024-10-29 -
Proponent
Peter Ballantyne Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89013
Nearby assessments
...within 200 kilometres-
Upgrade Single Tower & New Fibre Installation
Project site 5: Central East region - Pelican Narrows -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Pelican Narrows Lagoon Expansion
Pelican Narrows I.R. No. 184B -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Lagoon Expansion
The Peter Ballantyne Cree Nation (PBCN) Kimosom Pwatinahk I.R No. 203 -
Deschambault Lake Road Resurfacing and Drainage Improvements
Kimosom Pwatinahk I.R. No. 203 -
Sandy Bay Lagoon Upgrade
Peter Ballantyne Cree Nation WAPASKOKIMAW INDIAN RESERVE NO. 202 -
Upgrade Single Tower & New Fibre Installation
Project site 6: Central East region - Sandy Bay -
Sandy Bay Road Upgrades
Wapaskokimaw Indian Reserve No. 202 -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Upgrade Single Tower & New Fibre Installation
Project site 3: Central East region - Denare Beach -
McIlvenna Bay Mine Project
Creighton -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 6: West Central region - Stanley Mission -
Lac La Ronge Indian Band Stanley Mission - Loon Lake Subdivision Stage 3
Stanley Mission 157 -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Mathias Colomb -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Sturgeon Weir Water and Wastewater Upgrades
Sturgeon Weir I.R. 205 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 5: West Central region - Grandmother's Bay -
Mathias Colomb Cree Nation Nursing Station Replacement
Mathias Colomb Cree Nation -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Upgrade Single Tower & New Fibre Installation
Project site 7: Central East region - Sturgeon Landing -
Peter Ballantyne Cree Nation Southend Wastewater and Raw Water Upgrades
Southend Indian Reserve No. 200 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 4: West Central region - Southend & Reindeer -
Southend RCMP Detachment Major Renovation
Southend -
Peter Ballantyne Cree Nation Southend Lot Drainage and Improvement
Southend -
Peter Ballantyne Cree Nation Southend Solid Waste Transfer Station
SE 1/4 36-10-84 W2M -
La Ronge Area Peat Harvesting Project
La Ronge -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
La Ronge RCMP New Detachment
La Ronge -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Opaskwayak Cree Nation (OCN) Bracken Dam Earthen Dike Extension
Opaskwayak Cree Nation -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Red Earth River Dike Extension
Red Earth IR 29A -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation