Deschambault Lake Road Resurfacing and Drainage Improvements
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Peter Ballantyne Cree Nation (PBCN) is planning to rehabilitate approximately 6 km of existing community roads and drainage infrastructure in Kimosom Pwatinahk I.R. No. 203 (Deschambault Lake). Many of the existing roads have developed problems such as rutting, uneven surfaces, washed-out areas, and insufficient traffic gravel, while drainage in several areas has been impacted by shallow ditches, blocked or deteriorated culverts, and limited drainage capacity. The project will focus on improving road conditions and restoring proper drainage to reduce flooding and improve safety for residents.
Road upgrades will include reshaping the road base, adding new traffic gravel, improving drainage ditches, and replacing or installing culverts and catch basins. All existing culverts will be replaced, with two new cross-drain culverts and five new catch basins added to improve water flow. Ditches will be re-excavated and cleared of vegetation where necessary, and erosion protection measures such as riprap and geotextile will be installed at culvert inlets, outlets, and steeper ditch sections. The project will also include construction of a 1 km long, 2 m wide gravel pedestrian walkway along the south side of Kistapiskaw Street to improve pedestrian safety. Additional work includes driveway upgrades, landscaping with topsoil and grass seeding, and proper disposal of vegetation and debris.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | April 13, 2026 |
| 1 | Notice of Intent to Make a Determination – Start of Public Comment Period | - | March 6, 2026 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Kimosom Pwatinahk I.R. No. 203 (Saskatchewan)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2026-03-06 -
Proponent
Peter Ballantyne Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90281
Nearby assessments
...within 200 kilometres-
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Deschambault Lake Lagoon Expansion
The Peter Ballantyne Cree Nation (PBCN) Kimosom Pwatinahk I.R No. 203 -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Pelican Narrows Subdivision Stage 7
Pelican Narrows I.R. No. 184B -
Upgrade Single Tower & New Fibre Installation
Project site 5: Central East region - Pelican Narrows -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Pelican Narrows Lagoon Expansion
Pelican Narrows I.R. No. 184B -
Upgrade Single Tower & New Fibre Installation
Project site 3: Central East region - Denare Beach -
Lac La Ronge Indian Band Stanley Mission - Loon Lake Subdivision Stage 3
Stanley Mission 157 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 6: West Central region - Stanley Mission -
Sandy Bay Lagoon Upgrade
Peter Ballantyne Cree Nation WAPASKOKIMAW INDIAN RESERVE NO. 202 -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Upgrade Single Tower & New Fibre Installation
Project site 6: Central East region - Sandy Bay -
McIlvenna Bay Mine Project
Creighton -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Sandy Bay Road Upgrades
Wapaskokimaw Indian Reserve No. 202 -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon -
La Ronge Area Peat Harvesting Project
La Ronge -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 5: West Central region - Grandmother's Bay -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Sturgeon Weir Water and Wastewater Upgrades
Sturgeon Weir I.R. 205 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
La Ronge RCMP New Detachment
La Ronge -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Upgrade Single Tower & New Fibre Installation
Project site 7: Central East region - Sturgeon Landing -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Peter Ballantyne Cree Nation Southend Wastewater and Raw Water Upgrades
Southend Indian Reserve No. 200 -
Peter Ballantyne Cree Nation Southend Solid Waste Transfer Station
SE 1/4 36-10-84 W2M -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 4: West Central region - Southend & Reindeer -
Southend RCMP Detachment Major Renovation
Southend -
Peter Ballantyne Cree Nation Southend Lot Drainage and Improvement
Southend -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Mathias Colomb -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Red Earth River Dike Extension
Red Earth IR 29A -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Mathias Colomb Cree Nation Nursing Station Replacement
Mathias Colomb Cree Nation -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Opaskwayak Cree Nation (OCN) Bracken Dam Earthen Dike Extension
Opaskwayak Cree Nation -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Montreal Lake RCMP New Detachment
Montreal Lake -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour