Sturgeon Weir Water and Wastewater Upgrades
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Peter Ballantyne Cree Nation (PBCN) is proposing to expand the current wastewater treatment lagoon system located within Sturgeon Weir Indian Reserve No. 205 in order to meet the 20-year design population of the community of Sturgeon Landing. The existing lagoon is located 1.4 km east of the community of Sturgeon Landing, and about 675 m east of the Saskatchewan/Manitoba border. Proposed works include the expansion of the two-cell facultative lagoon on approximately 7 hectares of land. Forested buffers will be maintained around the property edges where possible. Clay for the lagoon cell liner will be sourced from a borrow pit located approximately 3.5 km north of the existing lagoon.
The lagoon expansion project is on Manitoba crown land. Expansion of the existing lagoon requires approval from the Government of Manitoba under applicable acts and regulations. The existing lagoon is currently operating under an existing Environment Act licence and will continue to operate under the same licence following expansion.
PBCN is also proposing to upgrade and expand the current water treatment plant (WTP). The WTP be upgraded to include mechanical, treatment process, and electrical components, and a new standby generator and two new raw water wells will be added. The WTP upgrades take place within Sturgeon Weir Indian Reserve No. 205, Saskatchewan at the corner of Highway No. 967 and East Avenue.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | January 19, 2026 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | July 29, 2025 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Sturgeon Weir I.R. 205 (Manitoba)
-
Nature of Activity
- Water Management
- Waste Management
-
Assessment Status
Completed -
Start Date
2025-07-29 -
Proponent
Peter Ballantyne Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89772
Nearby assessments
...within 200 kilometres-
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Upgrade Single Tower & New Fibre Installation
Project site 7: Central East region - Sturgeon Landing -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 3: Central East region - Denare Beach -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
McIlvenna Bay Mine Project
Creighton -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Opaskwayak Cree Nation (OCN) Bracken Dam Earthen Dike Extension
Opaskwayak Cree Nation -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Red Earth River Dike Extension
Red Earth IR 29A -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
Mosahiken Cree Nation - Road Upgrades - 2324
Mosahiken -
Mosakahiken Cree Nation Child and Family Wellness Building
Mosakahiken Cree Nation -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Moose Lake -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Launch Ramp Replacement - Moose Lake, Manitoba
Moose Lake, Manitoba -
Moose Lake Harbour Improvements
Moose Lake Small Craft Harbour -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Deschambault Lake Lagoon Expansion
The Peter Ballantyne Cree Nation (PBCN) Kimosom Pwatinahk I.R No. 203 -
Pelican Narrows Lagoon Expansion
Pelican Narrows I.R. No. 184B -
Pelican Narrows Subdivision Stage 7
Pelican Narrows I.R. No. 184B -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Upgrade Single Tower & New Fibre Installation
Project site 5: Central East region - Pelican Narrows -
Deschambault Lake Road Resurfacing and Drainage Improvements
Kimosom Pwatinahk I.R. No. 203 -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Sandy Bay Lagoon Upgrade
Peter Ballantyne Cree Nation WAPASKOKIMAW INDIAN RESERVE NO. 202 -
Upgrade Single Tower & New Fibre Installation
Project site 6: Central East region - Sandy Bay -
Sandy Bay Road Upgrades
Wapaskokimaw Indian Reserve No. 202 -
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Mathias Colomb -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Mathias Colomb Cree Nation Nursing Station Replacement
Mathias Colomb Cree Nation -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Easterville Harbour Wharf and Launch Ramp Reconstruction
Easterville, Manitoba -
Chemawawin Cree Nation Transitional Housing Building
Chemawawin Cree Nation -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B