Easterville Harbour Wharf and Launch Ramp Reconstruction
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Fisheries and Ocean Canada - Small Craft Harbours (DFO-SCH) are planning to reconstruct a timber frame wharf and Concrete launch ramp at the Easterville Small Craft Harbour. Work is currently proposed for fall/winter 2024/25.
The proposed project requires approvals from Fisheries and Oceans Canada and Transport Canada.
The Easterville harbour is located on the south-eastern shore of Cedar Lake in Easterville, Manitoba. The harbour can be found directly north of the junction of road 327 (Main St.) and Shaguygun road in Easterville.
The proposed reconstruction include demolition and replacement of the boat launch, and replacement and expansion of a new treated timber wharf along the southeastern extent of the harbour. New pre-cast concrete pads will be installed in the same orientation as the existing ramp design. The new southeast wharf will be a treated timber crib and span design which will be constructed along the shoreline and extend into the central harbour basin. The footprint of the new wharf will partially overlap with the existing structure, however the orientation will be modified slightly and extended.
Construction methodology will be determined by a hired contractor, however previous projects have provided examples of typical construction methods. The removal and construction of launch ramps has typically been completed by using a excavator working from shore. An excavator has the capacity to remove the individual concrete pads, then place and shape the base material, and then place the new pre-cast concrete pads. The demolition of the old wharf and construction of the new wharf structure will use a combination of heavy equipment and hand power tools. The cribs will be constructed on-site uplands and moved into place. The cribs will then be sunk into position through an open cut in the ice. Once in position, the cribs will be filled with ballast rock. Once all cribs are placed, stringers, decking and other wharf components will be installed.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 3 | Notice of Determination - Fisheries and Oceans Canada and Transport Canada | - | March 1, 2024 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | January 15, 2024 |
Contacts
Small Craft Harbours - Ontario & Prairie RegionFisheries and Oceans Canada
Chris McDermid, Environmental Advisor
501 University Cresent
Winnipeg, Manitoba R3T 2N6
Telephone: 431-335-7530
Email: chris.mcdermid@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Easterville, Manitoba (Manitoba)
-
Nature of Activity
- Ports and Harbours
-
Assessment Status
Completed -
Start Date
2024-01-15 -
Proponent
Fisheries and Oceans Canada, Small Craft Harbours, Ontario & Prairie Region -
Authorities
- Fisheries and Oceans Canada
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
87214
Nearby assessments
...within 200 kilometres-
Chemawawin Cree Nation Transitional Housing Building
Chemawawin Cree Nation -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik - CHRT41 - P053203 - Phase 2 JP Project - 2324
Misipawistik Cree Nation -
New Fibre Installation
Grand Rapids (Misipawistik Cree Nation) -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Launch Ramp Replacement - Moose Lake, Manitoba
Moose Lake, Manitoba -
Moose Lake Harbour Improvements
Moose Lake Small Craft Harbour -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Moose Lake -
Mosahiken Cree Nation - Road Upgrades - 2324
Mosahiken -
Mosakahiken Cree Nation Child and Family Wellness Building
Mosakahiken Cree Nation -
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Opaskwayak Cree Nation (OCN) Bracken Dam Earthen Dike Extension
Opaskwayak Cree Nation -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Rossville Small Craft Harbour Improvements
Rossville (Mission Island) Small Craft Harbour -
Norway House Cree Nation School Renovation and Playground CSC28
Norway House Cree Nation -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Norway House Dock Removal
Norway House -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
New Tower Construction, Upgrade Towers & New Fibre Installation
Project site 1: Norway House Cree Nation -
Norway House Cree Nation Business Center
Norway House Cree Nation -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Poplar River - Harbour Improvements
Poplar River -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Poplar River -
Poplar River Bridge Replacement
Poplar River First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Teacherages Project (Site Servicing)
Poplar River First Nation -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 1: Poplar River 16 Tower 1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 2: Poplar River 16 Tower 2 -
Poplar River First Nation School
Poplar River Manitoba School -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Upgrade Single Tower & New Fibre Installation
Project site 7: Central East region - Sturgeon Landing -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Sturgeon Weir Water and Wastewater Upgrades
Sturgeon Weir I.R. 205 -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Launch Ramp Reconstruction - Whiskey Jack Portage, MB - Fall 2021
Whiskey Jack Portage -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Lalor Concentrator Project
210 kilometres east of Flin Flon