New Fibre Installation - Dauphin River
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Broadband Communications Inc. plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the Anama Bay (Dauphin River) community. The project involves the installation of approximately 5 km of underground fiber optic cable along Zettergreen Ave. to the 513 Rd. in the Anama Bay (Dauphin River) community.
The cable is to be buried by directional drilling and trenching in existing roadway alignments.
Latest update
May 27, 2025 - Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- relevant potential environmental effects;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, Innovation, Science and Economic Development Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, Innovation, Science and Economic Development Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | May 27, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | April 23, 2025 |
Contacts
Innovation Science Economic Development CanadaNathalie Martel, Program Officer, Connected Canada Branch
C.D. Howe Building
235 Queen Street
Ottawa, Ontario K1A 0H5
Email: Get-connected-branchez-vous@ised-isde.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Project site 1: Anama Bay (Manitoba)
- Project site 2: Obushkudayang Indian Reserve (Manitoba)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2025-04-23 -
Proponent
Broadband Communications North Inc. -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
89483
Nearby assessments
...within 200 kilometres-
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation
Project site: Various parts of Manitoba -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River First Nation Road Upgrades
Berens River -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
Berens River Bridge Replacement
Berens River First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
East Trails Project - East Gate
Riding Mountain National Park -
Hnausa – Wharf Replacement Project
Hnausa -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
New Fibre Installation
Riding Mountain National Park -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Poplar River - Harbour Improvements
Poplar River -
Smallmouth Bass Project
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Poplar River -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Mooswa East Water Line
Riding Mountain National Park -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Poplar River Bridge Replacement
Poplar River First Nation -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Tiger Salamander Crossing
Riding Mountain National Park -
Poplar River First Nation School
Poplar River Manitoba School -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 1: Poplar River 16 Tower 1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 2: Poplar River 16 Tower 2 -
Teacherages Project (Site Servicing)
Poplar River First Nation -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Misipawistik - CHRT41 - P053203 - Phase 2 JP Project - 2324
Misipawistik Cree Nation -
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
New Fibre Installation
Grand Rapids (Misipawistik Cree Nation) -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Hollow Water Wharf Construction
Hollow Water -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Chemawawin Cree Nation Transitional Housing Building
Chemawawin Cree Nation -
Easterville Harbour Wharf and Launch Ramp Reconstruction
Easterville, Manitoba -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
Black River First Nation Watermain Renewal Project
Black River First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation Prevention Centre
Black River First Nation -
Black River Waste Transfer Station
Black River Reserve -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Tower Hill VHF Tower
Riding Mountain National Park -
Black River First Nation - Transitional Housing
Black River First Nation -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation