Chemawawin Cree Nation Water Treatment Plant Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Chemawawin Cree Nation Reserve No. 309 is located next to Easterville Manitoba, approximately 440km north of Winnipeg. Chemawawin Cree Nation IR No.2 is located adjacent to the community of Easterville on the south-east shore of Cedar Lake at the north end of Provincial Road #327. The current water and wastewater infrastructure at Chemawawin IR No. 2 consists of a combination of a centralized WTP that supplies both piped and trucked distribution, and facultative sewage lagoon with a combination of gravity sewer and holding tank/truck haul collection. The Community's existing WTP is located in the center of the community and was constructed in 1996 with a groundwater supply that is treated using manganese greensand filtration and chlorination prior to treated water storage in underground concrete reservoirs.
In its current configuration the WTP experiences operational issues due to its supply wells. It is therefore proposed to decommission two of the existing community supply wells and install additional groundwater well further to the south and southeast from the existing well field site. The proposed project includes construction of a new Water Treatment Plant (WTP) that is capable of processing established and expanded groundwater supply wells that will satisfy the community's 20 year design horizon. The WTP will be designed such that the treated water quality meets or exceeds the requirements set out on Health Canada's Guidelines for Drinking Water Quality (CDWQ) and Indigenous Services Canada (ISC) Design Guidelines for First Nations Water Works.
Infrastructure will include a new raw water supply system, a new water treatment plant and building which includes the following systems: pre-oxidation, greensand based filtration system and backwash pumps, final disinfection using sodium hypochlorite, new treated water reservoirs, wastewater holding tanks and waste pumps, distribution and high-flow pumps, standby diesel fueled generator and truck-fill. There will also be a wastewater discharge pipeline to the existing sewage collection systems that eventually discharged to the existing lagoon. The new WTP will be supplied with a 3 Phase, 600V service requiring a new electrical distribution infrastructure to be provided to the site.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Chemawawin Cree Nation Water Treatment Plant Project | - | July 2, 2021 |
| 1 | Chemawawin Cree Nation Water Treatment Plant Project | - | March 2, 2021 |
Contacts
Indigenous Services CanadaDan Benoit, Sr Environmental Specialist
365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-599-8579
Fax: 204-983-2936
Email: daniel.benoit@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Chemawawin Cree Nation (Manitoba)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2021-03-02 -
Proponent
Chemawawin Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81421
Nearby assessments
...within 200 kilometres-
Chemawawin Cree Nation Transitional Housing Building
Chemawawin Cree Nation -
Easterville Harbour Wharf and Launch Ramp Reconstruction
Easterville, Manitoba -
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Misipawistik - CHRT41 - P053203 - Phase 2 JP Project - 2324
Misipawistik Cree Nation -
New Fibre Installation
Grand Rapids (Misipawistik Cree Nation) -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B -
Launch Ramp Replacement - Moose Lake, Manitoba
Moose Lake, Manitoba -
Moose Lake Harbour Improvements
Moose Lake Small Craft Harbour -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Moose Lake -
Mosahiken Cree Nation - Road Upgrades - 2324
Mosahiken -
Mosakahiken Cree Nation Child and Family Wellness Building
Mosakahiken Cree Nation -
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Opaskwayak Cree Nation (OCN) Bracken Dam Earthen Dike Extension
Opaskwayak Cree Nation -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Rossville Small Craft Harbour Improvements
Rossville (Mission Island) Small Craft Harbour -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Norway House Cree Nation School Renovation and Playground CSC28
Norway House Cree Nation -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Norway House Dock Removal
Norway House -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
New Tower Construction, Upgrade Towers & New Fibre Installation
Project site 1: Norway House Cree Nation -
Norway House Cree Nation Business Center
Norway House Cree Nation -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Poplar River - Harbour Improvements
Poplar River -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Poplar River -
Poplar River Bridge Replacement
Poplar River First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Teacherages Project (Site Servicing)
Poplar River First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 1: Poplar River 16 Tower 1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 2: Poplar River 16 Tower 2 -
Poplar River First Nation School
Poplar River Manitoba School -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Upgrade Single Tower & New Fibre Installation
Project site 7: Central East region - Sturgeon Landing -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Sturgeon Weir Water and Wastewater Upgrades
Sturgeon Weir I.R. 205 -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Launch Ramp Reconstruction - Whiskey Jack Portage, MB - Fall 2021
Whiskey Jack Portage -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin